For week 14 update I was working on the church's building. I had to increase its length because it was a bit on the small side, and I made it with 5 potential floors. The 5th would be the future bell towers. So far, the front of the church is only finished but i still need to work on the interior, sides back and top of the church.
For week 5 update I worked on the church building a bit more, added stairs and fooled around with the bench sizes.
Since I didn't show a video of last update and i failed to prepare a video this update, next update will have a video on the work I have done for the 3 updates..